Development-Lifecycle-and-Deployment-Designer PDF Exam Material 2023 Realistic Development-Lifecycle-and-Deployment-Designer Dumps Questions [Q34-Q55]

Share

Development-Lifecycle-and-Deployment-Designer PDF Exam Material 2023 Realistic Development-Lifecycle-and-Deployment-Designer Dumps Questions

Updated Salesforce Development-Lifecycle-and-Deployment-Designer Dumps – PDF & Online Engine


To get more information visit:

Development Lifecycle and Deployment Designer Exam Reference

 

NEW QUESTION 34
The team at Universal Containers is building an application on Java that will interact with its Salesforce application. They want to use SOQL queries to retrieve and make changes to smaller pieces of Salesforce metadata through this application.
Which API should the team leverage?

  • A. Metadata API
  • B. Tooling API
  • C. User Interface API
  • D. Any Salesforce API

Answer: B

 

NEW QUESTION 35
Universal Containers (UC) is working on a major project and has determined that its approach to a certain feature will no longer work with an upcoming Salesforce platform release (e.g., Winter to Spring).
What should a Technical Architect recommend to address this issue?

  • A. Continue with the current approach since Salesforce will rectify the issue prior to updating the production environment to the new platform release.
  • B. Submit a request to Salesforce to enable the 'delay upgrade' feature in their org. Have the UC administrator schedule the upgrade for a later date.
  • C. Determine the developer sandbox upgrade schedule, and have the developer refactor the approach to the feature in the upgraded sandbox.
  • D. Continue development in a non-upgraded sandbox, and have the developer update the API version of the code to the upcoming API version for testing purposes.

Answer: C

 

NEW QUESTION 36
Northern Trail Outfitters (NTO) recently acquired Eastern Trail Outfitters (ETO). NTO's sales leadership team had hands-on experience with the ETO's Sales Optimization app and have given the feedback that the app would benefit NTO's sales team.
Which option should the architect recommend for having ETO's Sales Optimization app in NTO's Salesforce org in the shortest possible time?

  • A. Create users in ETO's org and provide access to NTO's sales team
  • B. Create a core team and build the Sales Optimization app in NTO's org
  • C. Create a managed package of the app and deploy in NTO's org
  • D. Create an unmanaged package of the app and deploy in NTO's org

Answer: A

Explanation:
Explanation/Reference:

 

NEW QUESTION 37
There are many types of quality assurance techniques that can help minimize defects in software projects.
Which two techniques should an architect recommend, for Universal Containers to incorporate into its overall CI/CD pipeline?
Choose 2 answers

  • A. Stress testing
  • B. Automated browser testing
  • C. Business verification testing
  • D. Static code quality analysis

Answer: A,C

 

NEW QUESTION 38
The release will be deployed over a weekend, one week after Salesforce updates the production environment (e.g., from Winter to Spring). UC has found that a full sandbox refresh can take several days. What should the architect suggest as an optimal deployment plan?

  • A. Approximately six weeks before go -live, ensure the sandbox will be on the release preview. One week before go live, deploy to Staging. Deploy from Staging to Production at go-live
  • B. One month before go -live, deploy to Staging and to Production Support. Deploy from Production Support to Production at go-live
  • C. One week before go -live, initiate the Staging sandbox refresh and then immediately deploy to Staging.
    Deploy from Staging to Production at go-live
  • D. Two weeks before go -live, deploy to Staging and then refresh the Staging and Production support sandboxes. Deploy from Staging to Production at go-live

Answer: A

 

NEW QUESTION 39
Universal Containers has an active production org; and they are planning to release some new features to it next month. The team is working to prepare .1 deployment plan and reached out to the technical architect for inputs on rollback strategy.
What should a technical architect recommend?

  • A. Create a sandbox from production to take the backup of existing metadata. To roll back deployment, use destructivechanges.xml to delete new components and then deploy again to production using metadata from this sandbox.
  • B. Backup the existing metadata using ANT Migration Tool. To roll back deployment, manually delete new components and deploy again to production using backed up metadata.
  • C. Create a sandbox from production to take the backup of existing metadata. To roll back deployment, manually delete new components and then deploy again to production using metadata from this sandbox.
  • D. Backup the existing metadata using the ANT Migration Tool. To roll back deployment, deploy again to production using backed up metadata.

Answer: A

 

NEW QUESTION 40
What are two limitations an architect should consider when designing a strategy for managing technical reference data, with multiple related objects?
Choose 2 answers

  • A. Depth of nested relationships
  • B. HTTP response size
  • C. Apex CPU limits
  • D. Circular relationships

Answer: A,D

 

NEW QUESTION 41
Universal Containers has decided on a single-org strategy, despite having to deal with the complexity of having multiple lines of business (LOBs) inside a single org.
What are two common challenges in single-org strategy for multiple LOBs? (Choose two.)

  • A. Apex design will need to be mature and adhere to strict guidelines to support a large enterprise model
  • B. Lack of declarative sharing and visibility capabilities to ensure correct visibility of objects and records
  • C. Making Salesforce work with multiple currencies
  • D. The data model becomes more complex the scope in the org increases

Answer: A,D

Explanation:
Explanation/Reference: https://developer.salesforce.com/blogs/developer-relations/2014/10/enterprise-architecture-multi- org-strategy.html

 

NEW QUESTION 42
Universal Containers (UC) has a huge volume of metadata that cannot be deployed at once. What is the recommended strategy for UC to be successful with the deployment?

  • A. Use a continuous integration tool such as Jenkins to deploy in the right order.
  • B. Identify metadata dependencies, create logical groupings, and deploy in the right order.
  • C. Sort and group the metadata alphabetically and deploy them in the same order.
  • D. Use a combination of the Ant migration tool and change sets for deployment.

Answer: B

 

NEW QUESTION 43
Universal Containers (UC) is considering implementing a minor change policy for a series of low-risk user stories that are commonly received by the UC admins. The policy would allow admins to make these changes directly in production. UC does not have continuous integration/continuous delivery (CI/CD) in place.
Which three best practices should the architect suggest UC follow for their new change policy? (Choose three.)

  • A. All changes should still be tested
  • B. CI/CD is required in to successfully manage minor changes
  • C. Minor changes do not need to be documented and can be made at any time
  • D. Downstream environments will not be automatically updated when production changes
  • E. Minor changes should be thoroughly documented and follow some type of standard cadence

Answer: A,B,E

 

NEW QUESTION 44
Universal Containers (UC) has a recruiting application using Metadata API version 35, and deployed it in production last year. The current Salesforce platform is running on API version 46. A new field has been introduced on the object ApexPage in API version 46. A UC Developer has developed a new Apex page that contains the new field and is trying to deploy the page using the previous deployment script that uses API version 35.
What will happen during the deployment?

  • A. The deployment script will fail because the platform doesn't support the previous API version 35.
  • B. The deployment script will fail because the new field is NOT known for the previous API Version 35.
  • C. The deployment script will pass because the new field is backward compatible with the previous API version 35.
  • D. The deployment script will pass because the new field is supported on the current platform version.

Answer: B

 

NEW QUESTION 45
Universal Containers (UC) works with different partners and has few admin resources that take care of the day-to-day deployment tasks. As a result, UC would like to find a way to automate the deployments using Metadata API.
Which two limitations of Metadata API should be considered when using Metadata API-based deployments?
(Choose two.)

  • A. Deploy and retrieve up to 10,000 files at once.
  • B. Maximum size of deployed .zip file is 400 MB.
  • C. Deploy up to 10,000 files, but retrieve more than 10,000 files.
  • D. Maximum size of deployed .zip file is 39 MB.

Answer: A,D

Explanation:
Explanation

 

NEW QUESTION 46
Universal Containers has a large call center that has a limited inventory and must ensure there is product availability before an Opportunity is marked as Closed. Custom Apex has been implemented to check inventory levels before an Opportunity is saved. What should an architect consider before recommending Performance testing?

  • A. Number of concurrent transactions
  • B. Number of unit tests
  • C. Number of debug log entries
  • D. Number of Apex Hammer failures

Answer: A

 

NEW QUESTION 47
Universal Containers has just initiated a project to implement a custom container tracking application with a large development team. The project manager is concerned that the large number of developers in a single developer pro sandbox could lead to challenges with code being overwritten. Which two methods should be used to mitigate this risk? Choose 2 answers

  • A. Provide each developer their own sandbox developer org and implement a code repository and continuous integration to merge code into the developer pro sandbox (Missed)
  • B. Replace the developer pro sandbox with a Partial copy sandbox
  • C. Provide each developer their own sandbox developer org, and implement managed packages to deploy to the merge
  • D. Use a single sandbox and strictly coordinate development across shared components, and implement a code repository to allow developers to merge code into a common repository (Missed)

Answer: A,D

 

NEW QUESTION 48
What is the process used to initiate a connection for change sets?

  • A. Modify the source org to allow an inbound connection to the target org
  • B. Modify the target orgto accept an inbound connection from the source org
  • C. Modify the target org to accept an outbound connection from the source org
  • D. Modify the source org to allow an outbound connection to the target org

Answer: B,D

 

NEW QUESTION 49
Universal Containers (UC) is preparing for the new Salesforce release in a couple of months, and has several ongoing development projects that may be affected.
Which three steps should the team at UC take to prepare for this release? (Choose three.)

  • A. Upgrade any SOAP integrations to the newest WSDL as early as possible.
  • B. Refresh a Sandbox during the Release Preview Window to ensure they have the upcoming release.
  • C. Review the release notes for automatically-enabled features and technical debt.
  • D. Run regression tests in an upgraded sandbox to detect any issues with the upgrade.
  • E. Contact Salesforce to schedule a time to upgrade the Full sandbox.

Answer: B,C,D

 

NEW QUESTION 50
Universal Containers CUC) Customer Community is scheduled to go live in the Europe, Middle East, and Africa (EMEA) region in 3 months. UC follows a typical centralized governance model. Two weeks ago, the project stakeholders informed the project team about the recent changes in mandatory compliance requirements needed to go live. The project team analyzed the requirements and have estimated additional budget needs of 30^0 of the project cost for incorporating the compliance requirements.
Which management team is empowered to approve this additional budget requirements?

  • A. Project Management Committee
  • B. Executive Steering Committee
  • C. Change Control Board
  • D. Security Review Committee

Answer: B

 

NEW QUESTION 51
Universal Containers (UC) maintains its Salesforce org using its internal tools and processes for managing its application lifecycle. The UC team has been facing challenges on their development processes in their recent two releases. The architect has recommended the UC team to follow the org development model to address the challenges faced.
Which two characteristics of the org development model will help UC address the challenges?
Choose 2 answers

  • A. Automated defect fixing
  • B. Automated sandbox provisioning
  • C. Automated change tracking
  • D. Automated deployment

Answer: C,D

 

NEW QUESTION 52
A Salesforce partner intends to build a commercially available application by creating a managed package for distribution through AppExchange.
What two types of environments can the partner use for development of the managed package? Choose 2 answers

  • A. Developer Pro sandbox
  • B. Developer sandbox
  • C. Partner Developer Edition
  • D. DeveloperEdition

Answer: B,C

 

NEW QUESTION 53
A developer with Universal Containers recently created a flow in the developer sandbox. While working on the flow, the developer deactivated it and made updates multiple times before the flow worked as desired. Now the developer is planning to use a change set to migrate the flow to the QA sandbox.
What two statements should be considered when migrating the flow with change sets?
Choose 2 answers

  • A. When a change set with a multiple versioned flow is uploaded, it includes all the versions of the flow.
  • B. When a change set with a multiple versioned flow is uploaded, and no active version is available, it includes the most recent inactive version of the flow.
  • C. When a change set with a multiple versioned flow is uploaded, and no active version is available, it throws an exception.
  • D. When a change set with a multiple versioned flow is uploaded, it includes only the active version of the flow.

Answer: B,D

 

NEW QUESTION 54
Universal Containers has five development teams. The performance of the teams has been good, but the number of bugs has been increasing. After each sprint, they need more time to understand the code and make changes.
What are two ways to improve the performance?
Choose 2 answers

  • A. Define and follow code standards.
  • B. Sprint review process.
  • C. Definea team that will analyze/approve all changes.
  • D. Version control system to identify who is generating the bugs.

Answer: A,B

 

NEW QUESTION 55
......

Salesforce Development-Lifecycle-and-Deployment-Designer Dumps PDF Are going to be The Best Score: https://pass4sure.practicedump.com/Development-Lifecycle-and-Deployment-Designer-exam-questions.html