NEW 2026 Certification Sample Questions C_P2W43_2023 Dumps & Practice Exam [Q33-Q58]

Share

NEW 2026 Certification Sample Questions C_P2W43_2023 Dumps & Practice Exam

C_P2W43_2023 Deluxe Study Guide with Online Test Engine

NEW QUESTION # 33
Which options do you have in SAP S/4HANA Asset Management, Public Cloud Edition? Note: There are 2 correct answers to this question

  • A. You do NOT have access to the SAP S/4HANA back-end system.
  • B. You can configure SAP S/4HANA Cloud via the self-service configuration UI.
  • C. You can configure SAP S/4HANA Cloud via the SAP Asset Intelligence Network
  • D. You have access to the SAP S/4HANA back-end system

Answer: A,B


NEW QUESTION # 34
How do you map a counter replacement in SAP S/4HANA Asset Management?

  • A. Create a new measurement document and assign a valuation code for counter replacement.
  • B. Assign a catalogue type for counter replacement to the measuring point category.
  • C. Deactivate the current counter and create a new counter.
  • D. Create a new measurement document marked as a counter replacement.

Answer: D


NEW QUESTION # 35
What do you need to configure to enable entries in the action log of a piece of equipment?

  • A. Activate the change documents for the equipment reference category.
  • B. Define the corresponding history related field for the equipment reference category.
  • C. Define history related fields in the usage period customizing.
  • D. Activate the change documents for the equipment category.

Answer: C,D


NEW QUESTION # 36
Which scheduling parameters are used in a multiple-counter plan? Note: There are 2 correct answers to this question.

  • A. Factory calendar
  • B. Start date
  • C. Scheduling period
  • D. Scheduling indicator

Answer: B,C


NEW QUESTION # 37
What do you have to consider regarding a cross-plant planning scenario?

  • A. Multiple planning plants are assigned to a maintenance plant (m: 1).
  • B. Multiple maintenance plants are assigned to a planning plant (n: 1).
  • C. It is only possible within the same company code.
  • D. Only a maximum number of five maintenance plants can be assigned to a planning plant.

Answer: B


NEW QUESTION # 38
Which functionalities are available in the SAP Service and Asset Manager (SAP Asset Manager) for a maintenance worker? Note: There are 2 correct answers to this question

  • A. Change BOM Create a work order on the ESRI map
  • B. Confirm time sheets Attach documents
  • C. Display maps Display and maintain technical objects
  • D. Schedule resources Change task list

Answer: B,C


NEW QUESTION # 39
Which settings must be customized to set up Inspection Checklist processing? Note: There are 2 correct answers to this question

  • A. Assign an Inspection Type to a Maintenance Order Type.
  • B. Create a control key which expects inspection characteristic assignments
  • C. Assign an Inspection Type to a Maintenance Order Type and a Planning Plant
  • D. Maintain settings at plant level for usage decisions.

Answer: A,D


NEW QUESTION # 40
The maintenance engineer creates a strategy plan with the call object maintenance order. Shift factors are set to 100% which date is relevant for the calculation of future planned dates if the maintenance work is delayed?

  • A. The date of the final confirmation
  • B. Technical completion date of the maintenance order
  • C. Actual finish date of the maintenance order
  • D. Planned date of the next call, independent of maintenance order dates

Answer: B


NEW QUESTION # 41
What are characteristics of the structure indicator? Note: There are 2 correct answers to this question

  • A. It restricts the number of hierarchical levels to no more than 6
  • B. It defines the allowed characters for a functional location
  • C. It limits the types of characters in the edit mask to Alpha and Numeric.
  • D. It sets the hierarchy levels of the functional location structure.

Answer: C,D


NEW QUESTION # 42
What is the goal of embedded analytics in SAP S/4HANA?

  • A. To integrate BW Data Store Objects
  • B. To allow both tactical and strategic analyses within the S/4HANA core
  • C. To integrate BW Info Cubes
  • D. To combine transactional and analytical processing

Answer: D


NEW QUESTION # 43
Which of these are necessary steps of the Inspection Checklist process? Note: There are 2 correct answers to this question

  • A. Generate Inspection Lols within the checklists view.
  • B. Record the usage decision for an Inspection Lot
  • C. Generate Inspection Lots assigned to maintenance order headers.
  • D. Link PM task list with assigned inspection point type to a maintenance item.

Answer: B,C


NEW QUESTION # 44
Which functions are available in the Resource Scheduling for Maintenance Planners app? Note: There are 2 correct answers to this question.

  • A. Schedule and dispatch maintenance operations by shifts.
  • B. Monitor maintenance order operations due in the next 4 weeks
  • C. Print job papers from a maintenance order.
  • D. Dispatch maintenance order operations

Answer: B,D


NEW QUESTION # 45
Which steps support the maintenance technician in the Report and Repair Malfunction app (3 tiles)? Note: There are 3 correct answers to this question

  • A. Verify planned and actual costs
  • B. Complete the malfunction report
  • C. Assign a production resource tool (PRT) to the operation
  • D. Find malfunction records already created in a list
  • E. Plan repair work for the responsible work center

Answer: B,D,E


NEW QUESTION # 46
You cancel the technical completion of a work order. What are the effects? Note: There are 2 correct answers to this question?

  • A. Open reservations are recompiled.
  • B. Open purchase requisitions are recompiled
  • C. Referenced notifications are put in Process again.
  • D. Open purchase orders are recompiled.

Answer: A,B


NEW QUESTION # 47
Which objects have been enhanced with linear data in maintenance processes? Note: There are 3 correct answers to this question

  • A. Maintenance plan item
  • B. Work order confirmation
  • C. Equipment task list
  • D. Maintenance plan header
  • E. Notification item

Answer: A,B,E


NEW QUESTION # 48
Which of the below objects can you assign in a notification item? Note: There are 2 correct answers to this question

  • A. One or more causes of damage.
  • B. Only one object part
  • C. One or more object parts
  • D. Only one cause of damage

Answer: A,C


NEW QUESTION # 49
What is characteristic for a maintenance order with status REL- if you also consider the capabilities of business functions? Note: There are 3 correct answers to this question.

  • A. The planner can change planned costs at the operation level
  • B. The assignment of the notification to the maintenance order header cannot be deleted.
  • C. Goods receipts for external services can be entered.
  • D. The planner can change estimated costs only at the header level
  • E. The controller can determine actual cost surcharges.

Answer: A,C,E


NEW QUESTION # 50
Which of the following is a prerequisite for external refurbishment?

  • A. Assign an external work center to a maintenance order operation
  • B. Activate the subcontracting indicator in an external activity.
  • C. Select the material group for externally refurbished materials.
  • D. Define the order type for external refurbishment.

Answer: B


NEW QUESTION # 51
Which of the following parameters are available when you define a new maintenance plan category? Note: There are 3 correct answers to this question.

  • A. Call object
  • B. Completion data
  • C. Order type
  • D. Change documents
  • E. Maintenance activity type

Answer: A,B,D


NEW QUESTION # 52
Which functionalities belong to the current portfolio of SAP Business Objects Business Intelligence? Note: There are 2 correct answers to this question.

  • A. Plant Maintenance Information Systems (PMIS)
  • B. SAP Quick Viewer
  • C. SAP Crystal Reports
  • D. SAP Lumira

Answer: C,D


NEW QUESTION # 53
You want to set up a scenario for regular maintenance. The first event should take place after 1 year, after that it is a regular cycle of 6 months. Which parameter do you have to use to map this in the system?

  • A. Maintenance package offset
  • B. Cycle modification factor
  • C. Package hierarchy
  • D. Scheduling indicator

Answer: A


NEW QUESTION # 54
Which operations can the responsible person perform after a maintenance order is technically completed? Note: There are 2 correct answers to this question

  • A. Change the settlement rule
  • B. Change the planned costs
  • C. Lock or unlock the order
  • D. Update the estimated costs

Answer: A,C


NEW QUESTION # 55
You want to display additional document information within the document flow of a maintenance order.
For which type of document must this be customized?

  • A. Invoice
  • B. Service entry sheet
  • C. Goods movement
  • D. Purchase order

Answer: C


NEW QUESTION # 56
You settle a refurbishment order with the batches (valuation types) having price control standard price. What is the effect? Note. There are 2 correct answers to this question.

  • A. The effective costs are posted as a credit memo to a price difference account
  • B. The goods receipt for the batch refurbished is posted with the value of the standard price.
  • C. The effective costs are posted to the respective batch (valuation type).
  • D. The goods receipt for the batch refurbished is posted with the value of the moving average price

Answer: A,B


NEW QUESTION # 57
How does the work center influence cost calculation in the maintenance order? Note: There are 2 correct answers to this question

  • A. Via cost center and activity type
  • B. Via organizational unit and personal hourly rate
  • C. Via cost center assigned to a personnel number
  • D. Via activity type and hourly rate

Answer: A,D


NEW QUESTION # 58
......

C_P2W43_2023 dumps review - Professional Quiz Study Materials: https://pass4sure.practicedump.com/C_P2W43_2023-exam-questions.html