
NEW 2026 Certification Sample Questions C_P2W43_2023 Dumps & Practice Exam
C_P2W43_2023 Deluxe Study Guide with Online Test Engine
NEW QUESTION # 33
Which options do you have in SAP S/4HANA Asset Management, Public Cloud Edition? Note: There are 2 correct answers to this question
- A. You do NOT have access to the SAP S/4HANA back-end system.
- B. You can configure SAP S/4HANA Cloud via the self-service configuration UI.
- C. You can configure SAP S/4HANA Cloud via the SAP Asset Intelligence Network
- D. You have access to the SAP S/4HANA back-end system
Answer: A,B
NEW QUESTION # 34
How do you map a counter replacement in SAP S/4HANA Asset Management?
- A. Create a new measurement document and assign a valuation code for counter replacement.
- B. Assign a catalogue type for counter replacement to the measuring point category.
- C. Deactivate the current counter and create a new counter.
- D. Create a new measurement document marked as a counter replacement.
Answer: D
NEW QUESTION # 35
What do you need to configure to enable entries in the action log of a piece of equipment?
- A. Activate the change documents for the equipment reference category.
- B. Define the corresponding history related field for the equipment reference category.
- C. Define history related fields in the usage period customizing.
- D. Activate the change documents for the equipment category.
Answer: C,D
NEW QUESTION # 36
Which scheduling parameters are used in a multiple-counter plan? Note: There are 2 correct answers to this question.
- A. Factory calendar
- B. Start date
- C. Scheduling period
- D. Scheduling indicator
Answer: B,C
NEW QUESTION # 37
What do you have to consider regarding a cross-plant planning scenario?
- A. Multiple planning plants are assigned to a maintenance plant (m: 1).
- B. Multiple maintenance plants are assigned to a planning plant (n: 1).
- C. It is only possible within the same company code.
- D. Only a maximum number of five maintenance plants can be assigned to a planning plant.
Answer: B
NEW QUESTION # 38
Which functionalities are available in the SAP Service and Asset Manager (SAP Asset Manager) for a maintenance worker? Note: There are 2 correct answers to this question
- A. Change BOM Create a work order on the ESRI map
- B. Confirm time sheets Attach documents
- C. Display maps Display and maintain technical objects
- D. Schedule resources Change task list
Answer: B,C
NEW QUESTION # 39
Which settings must be customized to set up Inspection Checklist processing? Note: There are 2 correct answers to this question
- A. Assign an Inspection Type to a Maintenance Order Type.
- B. Create a control key which expects inspection characteristic assignments
- C. Assign an Inspection Type to a Maintenance Order Type and a Planning Plant
- D. Maintain settings at plant level for usage decisions.
Answer: A,D
NEW QUESTION # 40
The maintenance engineer creates a strategy plan with the call object maintenance order. Shift factors are set to 100% which date is relevant for the calculation of future planned dates if the maintenance work is delayed?
- A. The date of the final confirmation
- B. Technical completion date of the maintenance order
- C. Actual finish date of the maintenance order
- D. Planned date of the next call, independent of maintenance order dates
Answer: B
NEW QUESTION # 41
What are characteristics of the structure indicator? Note: There are 2 correct answers to this question
- A. It restricts the number of hierarchical levels to no more than 6
- B. It defines the allowed characters for a functional location
- C. It limits the types of characters in the edit mask to Alpha and Numeric.
- D. It sets the hierarchy levels of the functional location structure.
Answer: C,D
NEW QUESTION # 42
What is the goal of embedded analytics in SAP S/4HANA?
- A. To integrate BW Data Store Objects
- B. To allow both tactical and strategic analyses within the S/4HANA core
- C. To integrate BW Info Cubes
- D. To combine transactional and analytical processing
Answer: D
NEW QUESTION # 43
Which of these are necessary steps of the Inspection Checklist process? Note: There are 2 correct answers to this question
- A. Generate Inspection Lols within the checklists view.
- B. Record the usage decision for an Inspection Lot
- C. Generate Inspection Lots assigned to maintenance order headers.
- D. Link PM task list with assigned inspection point type to a maintenance item.
Answer: B,C
NEW QUESTION # 44
Which functions are available in the Resource Scheduling for Maintenance Planners app? Note: There are 2 correct answers to this question.
- A. Schedule and dispatch maintenance operations by shifts.
- B. Monitor maintenance order operations due in the next 4 weeks
- C. Print job papers from a maintenance order.
- D. Dispatch maintenance order operations
Answer: B,D
NEW QUESTION # 45
Which steps support the maintenance technician in the Report and Repair Malfunction app (3 tiles)? Note: There are 3 correct answers to this question
- A. Verify planned and actual costs
- B. Complete the malfunction report
- C. Assign a production resource tool (PRT) to the operation
- D. Find malfunction records already created in a list
- E. Plan repair work for the responsible work center
Answer: B,D,E
NEW QUESTION # 46
You cancel the technical completion of a work order. What are the effects? Note: There are 2 correct answers to this question?
- A. Open reservations are recompiled.
- B. Open purchase requisitions are recompiled
- C. Referenced notifications are put in Process again.
- D. Open purchase orders are recompiled.
Answer: A,B
NEW QUESTION # 47
Which objects have been enhanced with linear data in maintenance processes? Note: There are 3 correct answers to this question
- A. Maintenance plan item
- B. Work order confirmation
- C. Equipment task list
- D. Maintenance plan header
- E. Notification item
Answer: A,B,E
NEW QUESTION # 48
Which of the below objects can you assign in a notification item? Note: There are 2 correct answers to this question
- A. One or more causes of damage.
- B. Only one object part
- C. One or more object parts
- D. Only one cause of damage
Answer: A,C
NEW QUESTION # 49
What is characteristic for a maintenance order with status REL- if you also consider the capabilities of business functions? Note: There are 3 correct answers to this question.
- A. The planner can change planned costs at the operation level
- B. The assignment of the notification to the maintenance order header cannot be deleted.
- C. Goods receipts for external services can be entered.
- D. The planner can change estimated costs only at the header level
- E. The controller can determine actual cost surcharges.
Answer: A,C,E
NEW QUESTION # 50
Which of the following is a prerequisite for external refurbishment?
- A. Assign an external work center to a maintenance order operation
- B. Activate the subcontracting indicator in an external activity.
- C. Select the material group for externally refurbished materials.
- D. Define the order type for external refurbishment.
Answer: B
NEW QUESTION # 51
Which of the following parameters are available when you define a new maintenance plan category? Note: There are 3 correct answers to this question.
- A. Call object
- B. Completion data
- C. Order type
- D. Change documents
- E. Maintenance activity type
Answer: A,B,D
NEW QUESTION # 52
Which functionalities belong to the current portfolio of SAP Business Objects Business Intelligence? Note: There are 2 correct answers to this question.
- A. Plant Maintenance Information Systems (PMIS)
- B. SAP Quick Viewer
- C. SAP Crystal Reports
- D. SAP Lumira
Answer: C,D
NEW QUESTION # 53
You want to set up a scenario for regular maintenance. The first event should take place after 1 year, after that it is a regular cycle of 6 months. Which parameter do you have to use to map this in the system?
- A. Maintenance package offset
- B. Cycle modification factor
- C. Package hierarchy
- D. Scheduling indicator
Answer: A
NEW QUESTION # 54
Which operations can the responsible person perform after a maintenance order is technically completed? Note: There are 2 correct answers to this question
- A. Change the settlement rule
- B. Change the planned costs
- C. Lock or unlock the order
- D. Update the estimated costs
Answer: A,C
NEW QUESTION # 55
You want to display additional document information within the document flow of a maintenance order.
For which type of document must this be customized?
- A. Invoice
- B. Service entry sheet
- C. Goods movement
- D. Purchase order
Answer: C
NEW QUESTION # 56
You settle a refurbishment order with the batches (valuation types) having price control standard price. What is the effect? Note. There are 2 correct answers to this question.
- A. The effective costs are posted as a credit memo to a price difference account
- B. The goods receipt for the batch refurbished is posted with the value of the standard price.
- C. The effective costs are posted to the respective batch (valuation type).
- D. The goods receipt for the batch refurbished is posted with the value of the moving average price
Answer: A,B
NEW QUESTION # 57
How does the work center influence cost calculation in the maintenance order? Note: There are 2 correct answers to this question
- A. Via cost center and activity type
- B. Via organizational unit and personal hourly rate
- C. Via cost center assigned to a personnel number
- D. Via activity type and hourly rate
Answer: A,D
NEW QUESTION # 58
......
C_P2W43_2023 dumps review - Professional Quiz Study Materials: https://pass4sure.practicedump.com/C_P2W43_2023-exam-questions.html