
Updated Jul 05, 2023 Verified Pass C-IBP-2211 Exam in First Attempt Guaranteed
Free C-IBP-2211 Sample Questions and 100% Cover Real Exam Questions (Updated 80 Questions)
The SAP C-IBP-2211 exam is designed to test the knowledge and skills of individuals who work with SAP Integrated Business Planning (IBP) for Supply Chain. This certification is intended for consultants, project managers, and application developers who are responsible for implementing and customizing SAP IBP for Supply Chain solutions. The exam evaluates the candidate's ability to configure and maintain the system, as well as their understanding of the different components of SAP IBP for Supply Chain.
NEW QUESTION # 19
For which of the following application jobs can you enter planning filters as parameters?Note: There are
2 correct answers to this question.
- A. Purge Key Figure Data
- B. Purge Non-Conforming Data
- C. Purge Master Data
- D. Create Time Periods for Time Profiles
Answer: A,C
NEW QUESTION # 20
What are the outputs of the Calculate Target Inventory Components Operator?Note: There are 3 correct answers to this question.
- A. Component Usage
- B. Reorder Point
- C. Recommended Safety Stock
- D. Target Cycle Stock
- E. Target Pipeline Stock
Answer: C,D,E
NEW QUESTION # 21
You need to use your resource cost effectively with a certain minimum use, even if it means producing more than demand.Which solutions would apply to this scenario?Note: There are 2 correct answers to this question.
- A. Balance can be achieved between excessive prebuild and minimum use by incorporating violation costs.
- B. Excess stock can be generated and will need to be staged in an overflow warehouse.
- C. Capacity leveling will be possible for production and storage resources.
- D. Minimum capacity utilization will result in pull production occurring.
Answer: A,B
NEW QUESTION # 22
You are invited to review a problem with a customer's SAP IBP Excel template performance.What areas with the biggest potential performance impact would you focus on?Note: There are 2 correct answers to this question.
- A. Number of local members and complexity of calculations
- B. Complex calculation graphs for key figures
- C. Excessive SAP IBP formatting in the Microsoft Excel UI
- D. Number of analytics charts displaying key figures' values
Answer: B,C
NEW QUESTION # 23
What are some of the available ABC segmentation methods in SAP IBP?Note: There are 2 correct answers to this question.
- A. By Number of Items (Sorted Values)
- B. By Pareto Principle (Sorted and Calculated Values)
- C. By Number of Items (Sorted Average)
- D. By Pareto Principle (Sorted and Cumulated %)
Answer: A,B
NEW QUESTION # 24
Which of the following conditions are relevant for subtotals in the planning view?Note: There are 2 correct answers to this question.
- A. The values of the attribute-based total at the highest attribute level in the planning level can be changed.
- B. The total value can be added before or after the selected attribute.
- C. Only attribute-based totals can be added to the planning view.
- D. The total number of attributes that can use subtotals in the planning view can be restricted.
Answer: B,D
NEW QUESTION # 25
You are setting up planing with lot sizes.What are some of the properties of lot sizes that you need to be aware of?Note: There are 2 correct answers to this question.
- A. Lot sizes are time-independent master data settings.
- B. Periodic lot size setting overrides the minimum lot size.
- C. Lot sizes are applicable for production and transportation quantities.
- D. Lot sizes are applicable for production and handling quantities.
Answer: A,D
NEW QUESTION # 26
Which of the following checks for master data and key figures does the Check Mode algorithm trigger?Note: There are 3 correct answers to this question.
- A. It checks whether the heuristic detects cycles formed by nodes (such as location products) in the supply chain network.
- B. It checks whether the location products specified in the master data are connected by customer sourcing rules within the supply chain network.
- C. It checks whether the sourcing in the Production Source Item Master Data type exists.
- D. It checks whether the location resource specified in the master data forms a cycle in the supply chain network.
- E. It checks whether the required planning level master data exists for a subset of input key figures.
Answer: A,B,E
NEW QUESTION # 27
Which parts of the S&OP high-level process would the Inventory planning and optimization process fit into?Note: There are 2 correct answers to this question.
- A. Demand Review, by using the output of demand planning as input into calculations
- B. Reconciliation Review, by providing inventory parameters for one consolidated plan
- C. Supply Review, by providing an input to supply network planning
- D. Management business Review, by providing the inventory targets for endorsement
Answer: A,C
NEW QUESTION # 28
Which of the following solutions are feasible when using the time series supply optimizer?Note: There are 3 correct answers to this question.
- A. Not respecting production capacity
- B. Not adhering to maximum transport values
- C. Violation of minimum resource utilization
- D. Violation of minimum aggregated inventory values
- E. Not-fully satisfied demands
Answer: C,D,E
NEW QUESTION # 29
Where can the results of a Time Series Analysis be used?Note: There are 2 correct answers to this question.
- A. In the Microsoft Excel add-in, where you can use them to limit and filter your planning views
- B. During XYZ segmentation in the Manage ABC/XYZ Segmentation Rules app
- C. In Global (multi-stage) Inventory Optimization to calculate time-phased Recommended Safety Stock Outputs
- D. In the Manage Forecast Error Calculations app - Demand Planning app to calculate the Forecast Error CV
Answer: B,C
NEW QUESTION # 30
You are adding a value-based filter to a planning view.Which of the following conditions apply?Note:
There are 3 correct answers to this question.
- A. You can add (or delete) planning objects to a planning view after these filters are applied.
- B. These filters can be used together with attribute totals in the same planning view.
- C. These filters are always applied based on the values stored in the database.
- D. You can only apply one value-based filter per planning view.
- E. The alerts dashboard is not available if a value-based filter is set for the open planning view.
Answer: C,D,E
NEW QUESTION # 31
Which type of Master Data will be represented by the Master Data Type LOCATIONFR?
- A. Compound Master Data Type
- B. Virtual Master Data Type
- C. External Master Data Type
- D. Reference Master Data Type
Answer: D
NEW QUESTION # 32
You are modeling a new product introduction.Which of the following steps can be part of your modeling process in the Manage Product Lifecycle app?Note: There are 2 correct answers to this question.
- A. Copy the launch dimension from the reference product to the new product
- B. Create planning objects for new combinations in the app
- C. Enter the Phase-out Start Date and Phase-out End Date
- D. Enter the product family to which the new product belongs
Answer: A,B
NEW QUESTION # 33
For your project, you create a new planning area and consider how to create analytics and alerts for it.How can you create these objects?
- A. Create analytics and alerts in the new planning area from scratch using the Intelligent Visibility application.
- B. Use the option for copying analytics and alerts when creating a new planning area from the sample SAPIBP1.
- C. Merge analytics and alerts into a new planning area from any sample planning area.
- D. Use the option for copying analytics and alerts into the new planning area from the existing custom planning area.
Answer: B
NEW QUESTION # 34
You need to create time periods for the time profile in a planning area.What should you be aware of when running the Create Time Periods application job?
- A. A time profile has to be activated so that the application job can proceed.
- B. This application job can be run for multiple time profiles at once.
- C. In the Parameter Section of the application job, choose the Time Profile ID and Planning Area.
- D. The assigned Planning Area must be active.
Answer: C
NEW QUESTION # 35
You need to define a new logic for a key figure to drive values from the PERPRODCUSTREGION level to the PERPRODCUST level.Which of the following configuration options are possible for this process?Note: There are 2 correct answers to this question.
- A. Splitting the values from aggregated to detailed level, based on the time profile attribute
- B. Splitting the values from aggregated to detailed level using multiplication by the proportions
- C. Splitting the values from aggregated to detailed level, based on a stored split-factor key figure
- D. Splitting the values from detailed to aggregated level by using a copy operator
Answer: B,C
NEW QUESTION # 36
Which of the following approaches could you take to reduce run times of an optimizer?Note: There are 3 correct answers to this question.
- A. Split into multiple planning areas to support weekly vs. daily planning needs.
- B. Use non-overlapping networks by using subnetwork ID maintained at Location-Products to reduce the size of the problem.
- C. Increase the use of incremental lot size beyond the frozen horizon.
- D. Keep the number of fairshare segments small.
- E. Avoid using telescopic time buckets.
Answer: A,B,E
NEW QUESTION # 37
You created a key figure and want to add calculations.Which of the following rules do you consider?Note: There are 2 correct answers to this question.
- A. The calculation chain for a key figure must always result in a calculated key figure.
- B. Aggregation calculations using SUM or MAX functions must be based on a higher aggregation level.
- C. All key figure calculations have calculation inputs, which can be marked as stored or calculated.
- D. Key figures can be calculated across different planning levels.
Answer: C,D
NEW QUESTION # 38
What do you need to be aware of when using multiple pairs of key figures in one copy operator? Note: There are 2 correct answers to this question.
- A. Copying multiple key figures can be processed sequentially.
- B. If necessary target key figures values are disaggregated.
- C. Copying multiple key figures on different planning levels is not possible.
- D. If necessary source key figures values are disaggregated.
Answer: A,D
NEW QUESTION # 39
......
The SAP C_IBP_2211 exam covers various topics, including IBP architecture, configuration, data integration, demand management, supply planning, and inventory optimization. The exam consists of 80 multiple-choice questions, and candidates are given a total of 180 minutes to complete it. The exam is available in several languages, including English, German, Japanese, and Portuguese, among others. Candidates must achieve a minimum score of 63% to pass the exam.
The SAP C_IBP_2211 certification demonstrates a candidate's ability to configure and implement SAP Integrated Business Planning for Supply Chain. It validates that the candidate has the knowledge and skills required to design and configure the IBP application, integrate data with other systems, and perform demand planning, supply planning, and inventory optimization. The certification is highly sought after by employers and is an essential requirement for anyone looking to work in SAP supply chain management.
Download Real SAP C-IBP-2211 Exam Dumps Test Engine Exam Questions: https://pass4sure.practicedump.com/C-IBP-2211-exam-questions.html